Projects and installations for industry in Mallorca

Industrial warehouses, factories and storage units require the legalisation of their installations, industrial fire safety and commissioning before the Administration. We handle the whole process for you.

Industrial warehouse in Mallorca
Legalisation of industrial installations in Mallorca.

What does a warehouse or industrial facility need?

An industrial activity brings together several installations and safety procedures:

Classification and licencePermanent activity under Law 7/2013.
Fire safety in industryClassification by configuration and intrinsic risk level (RSCIEI).
Electrical installationLow or high voltage, with a project when the power requires it (REBT).
Compressed air and pressureCompressed air installations and pressure equipment.
Gas and chemical productsGas installations and, where applicable, chemical storage (APQ).
Process climate controlClimate control and ventilation of the production processes.
LegalisationBefore the Directorate General of Industry, with construction management.

What do we do?

We manage the entire application process, from the initial consultation to the opening, so you only worry about your business:

1
StudyWe analyse your case and its classification.
2
Technical projectDrafting of the project and installations.
3
ProcessingLegalisation before the authorities.
4
OpeningConstruction management and final certificate.

Are you going to legalise a warehouse or industrial facility?

We classify the activity and legalise all installations up to commissioning.

Frequently asked questions

Which fire safety regulations apply to an industrial warehouse?

The Regulation on Fire Safety in Industrial Establishments (RSCIEI), which classifies the establishment by its configuration (types A-E) and its intrinsic risk level in order to set the protection measures.

Do the installations have to be legalised before the Industry authority?

Yes. Industrial installations (electrical, refrigeration, gas, pressure equipment, etc.) are legalised before the Directorate General of Industry for their commissioning.